Latest: Release 60.6November 2026

2026

Release 60.6#

Latest

Generic controls and frameworks in a new design that shows whether each control is carried out, a new reports page with eight modern standard reports, legal basis rulebooks and a measures library, and policies, procedures and departments in the new design.

✦New features#

  • #9521Generic controls in a new design that puts one question first: is the control carried out in a project? The list shows how many controls are in a project, which aren’t, overdue and failed tests, and for each control its projects, next test and last result.
  • #9521Add to project: add one or more generic controls to control projects straight from the control or the list. Only projects whose scope fits are offered, and a control without an owner gets one so the project tasks reach somebody.
  • #9521Generic control page with a Projects tab: each project that tests the control, how often, the last six results, the last result and the next test.
  • #9521Frameworks in a new design: each framework shows how many controls apply, how many are met by generic controls and how many are implemented. The framework page groups controls by control objective and flags applicable controls that no generic control meets.
  • #9521Statement of applicability as its own tab on a framework: decide applicable or not and write the reason directly in the list.
  • #9521In a framework control you can create a new generic control and map it in one go.
  • #9522Reports page in the new design, with the eight standard reports (process overview, system, third party, Article 30, process risk, risk report, Statement of Applicability, framework implementation) in one modern layout: branded cover, contents page, numbered sections and key facts tables.
  • #9517Legal basis as rulebooks: rules grouped by law and article, with a ready-made EU GDPR rulebook you can add with one click.
  • #9517Measures library: measure categories and their measures on one page, with how each measure is answered and where it’s linked.
  • Policies & procedures with a department navigator: see the policies of each department, including those inherited from departments above, and add or edit them in a side panel.
  • Departments as columns per level: move a department by drag and drop, and hand over its sub-departments, policies and people when you delete it.

↑Improvements#

  • #9517Data categories, process groups, data subjects, information obligations and retention rules in the new design, with where each item is used and adding and editing in a side panel.
  • #9521All adding, editing and linking for generic controls and frameworks now happens in side panels, so the page stays visible behind them.
  • #9521Changes to framework controls and control objectives, implementation checklist steps, and mapping a generic control to a framework control now show in the history.
  • #9519The workspace switcher marks the client itself as Top level and indents its partitions below it.

Release 60.5#

Images in the management statement and system description, new report tags and default report templates, new Projects, Privacy and Risk dashboards, a new design for risk scenarios with a risk scale per category, new emails for uploads and samples, and a new design for business impact assessment tasks.

✦New features#

  • #9503You can now add images to the management statement and the system description: use the image button in the toolbar, paste them or drag them in. Each image sits on its own line and can be resized by dragging its corner or setting its width. Images in an imported Word document are kept.
  • #9503${management.statement} and ${system.description} put the images into the Word report at the size you chose, scaled down to the page width when needed.
  • #9503New default report templates, used when an assessment has no template of its own: an assurance report for control assessments and a risk assessment report.
  • #9504New report tag ${project.tasks.noref}: the same tasks table as ${project.tasks}, without the Ref. column. See Report tags.
  • #9500Projects dashboard under Dashboards: ongoing and upcoming projects of the workspace and its partitions, with open tasks by assignee and by partition, an annual wheel and a timeline.
  • #9500Privacy dashboard under Dashboards: how complete, validated and up to date your data mapping is (Article 30 readiness, legal basis, information obligation, retention rules, data processor agreements and roles), Article 30 gaps, transfers outside the EU/EEA and a heat map by partition.
  • #9500Risk dashboard under Dashboards: risk scenarios, ratings, ratings above tolerance, mitigating controls and assets not yet rated, for the whole workspace and its partitions.
  • #9500Relative risk matrix: all risk categories on one matrix. Each level is placed by where it sits on its own scale, and every rating is compared with its own category’s tolerance.
  • #9500Above tolerance by risk category: each category against its own tolerance, as a share or a count, so categories with different scales can be compared fairly.
  • #9500Above tolerance by country: a map coloured by the number of ratings above tolerance in the partitions of each address country. Click a country to filter the dashboard on its partitions.
  • #9500Pick one risk category to see its own matrix and tolerance, and click any cell to see the ratings behind it.
  • #9500Download as PNG on the Risk dashboard’s matrix, country map and tolerance chart, and on the Risk matrix page.
  • #9495Each risk category now has its own scale: choose 3 to 6 levels for impact and for probability, name them, and write a definition for each level. Risk levels are calculated from the scale.
  • #9495Each risk category has its own risk matrix, showing where its scenarios sit.
  • #9495When you change a category’s scale, you choose where existing ratings move. Earlier ratings keep their score in the history.
  • #9490Auditors now get an email when a customer uploads files to a documentation collection task. Uploads to the same task within 10 minutes are gathered in one email that names the task.
  • #9490People collecting documentation now get an email when samples are taken on their task. Samples taken within 10 minutes are gathered in one email that names the task and lists the samples.
  • #9478Validation tasks now show what is being validated: the process or activity’s name, description and purpose, and what is currently mapped for that section, such as the legal basis or retention rules. The overview is read-only; only the validation itself is changed in the task.
  • #9478A completed control or contextual assessment task opened from the project page can be re-opened, so it can be answered again. The change is shown in the project’s history.

↑Improvements#

  • #9504${project.tasks} now gives one table per control objective. The header rows repeat on every page, each control objective after the first starts on a new page, and a row is never split across two pages.
  • #9505Tables and multi-line text from report tags now use your Word template’s body text formatting (font, size, colour and spacing) and its own heading styles. Bold, italic, underline and lists added in the platform are kept.
  • #9500The Overview menu is now called Dashboards. The Tree view and Validations pages have been removed, and the Compliance dashboard is hidden for now. The Risk dashboard is listed above the Risk matrix, and the Risk matrix asset filters are now switches.
  • #9495Risk scenarios has a new list and a new scenario page, with the threats, vulnerabilities and assets of each scenario, its highest residual risk and its matrix.
  • #9495Risk categories, threats and vulnerabilities have new lists that show where each one is used.
  • #9495A risk scenario keeps its category once it is set. Scenarios without a category are flagged so you can set one, and a category that has scenarios can’t be deleted.
  • #9495Adding and editing risk ratings on processes, activities, systems and contracts follows the category’s scale.
  • #9490Daily and weekly summary emails now show counts instead of long task lists: tasks per project with when they are due or overdue, together with file uploads, assignments and other activity since the last summary.
  • #9490If you collect documentation, the summary emails also show whether samples have been taken, how many, and the state of the samples in active projects.
  • #9490Both new emails can be switched on or off in the workspace’s email settings.
  • #9478Business impact assessment tasks have a new design. Short guidance and an impact scale explain how to assess the system, the impact on confidentiality, integrity and availability is chosen as on the asset pages’ Risk management tab, and the recovery time and recovery point objectives come with a short explanation.
  • #9478The Tasks tab of control and contextual assessment projects now lists the tasks grouped by asset, with progress per asset, search and filters, as on audits.
  • #9478Contextual assessment tasks show the comment above the attachments, and list the other questions on the same asset, so you can move between them without going back to the task list.
  • #9478Completed tasks have a new design that shows when and by whom the task was completed, the result, the comment and the attachments.

✓Bug fixes#

  • #9490White text in the green email header no longer turns dark when an email is read in dark mode on a phone.

Release 60.4#

Every project type now has the new project page, and every task opens in the new task panel. Control tasks have clearer results, contextual assessments are simpler to build and answer, and documents show who added them.

✦New features#

  • #9477Documents on tasks and on the project’s Documents tab now show who added each document and when.
  • #9478Update and validation tasks now start with a short description of what to do for that kind of task, in all four languages.
  • #9478Update, validation and control tasks list the project’s other tasks on the same process, activity, system or contract. Click one to open it in the same panel, so you can see the full picture without going back to the task list.

↑Improvements#

  • #9478Update, validation, control, security measure, risk and BIA projects now have the same project page as audits: a header with the project’s type, status, team, dates and task progress, an Overview with the description, scope, schedule, contributors, contact persons and recent activity, and Settings and History opened from the header. Overdue task reminders are set in the schedule, and Edit project now changes the title, tags and status.
  • #9478All tasks now open in the task panel, both on the project page and on Home, with the task on the left and the project’s details and help on the right.
  • #9478Control and security measure tasks are now answered with Completed, Deviations, Not performed or Not applicable. Earlier answers are shown as Completed (was Passed) and Deviations (was Failed). The comment can be formatted, attachments and links have their own section, and the task is closed with Finalize task. Controls no longer have separate pass and fail descriptions.
  • #9478Contextual assessment tasks open as a simple questionnaire: the question, attachments, and your answer and comment, on one page.
  • #9480Building a contextual assessment template is simpler. A question has two steps, Question and Input options, and only the fields a respondent fills in: the response, a comment and attachments.
  • #9480A business impact analysis no longer needs a template. When you start one, choose whether it covers processes or activities; each of their systems gets an impact assessment. Existing BIA templates and projects keep working.
  • #9478The schedule chart on project pages is replaced by the schedule card with the project’s dates. Relations and links to another client are now only offered on audits.
  • #9478Text fields, drop-downs and buttons have a new, lighter look throughout Complyon, and contact persons on projects have a new design.

✓Bug fixes#

  • #9478Fixed a bug where the response drop-down of a contextual assessment task opened from Home showed Yes and No instead of the template’s own answers.
  • #9478Fixed a bug where the history of a project without a start date couldn’t be loaded.

Release 60.3#

New pages for systems, processes and third parties: a process and its activities, and a third party and its contracts, are now one page. Auditors can also remind the client about OE testing samples.

✦New features#

  • #9452Auditors can now send the documentation collection users an email reminder about the OE testing samples they still need to answer. The Send reminder button is on the task’s OE testing tab.

↑Improvements#

  • #9369, #9371A process and its activities, and a third party and its contracts, are now one page. The process or third party comes first in a row under the page header, followed by its activities or contracts; pick one to open it under the same header. An activity now belongs to one process and a contract is with one third party, and an activity can be moved to another process from its menu. Activities and contracts that were linked to more than one before are marked, and the new Sort out shared links page helps you decide where each belongs: keep it in one, move it, or split an activity into two.
  • #9369The Risk management and Assessments tabs show a process and its activities together. Choose whether a new risk scenario applies to the whole process or to some of its activities, and see which activities an assessment covers. Process and activity pages also have a new layout, with History opened from the page header.
  • #9370New design for the Systems list and system pages. Each system has an overview of where it runs, its data, its security and where it’s used, and shows what’s still missing. Add a system in a side panel and let the AI find its logo (requires the AI module), retire a system instead of deleting it, move its links to another system, or duplicate it.
  • #9371New design for the Third parties list and contract pages. Upload an agreement and the AI suggests the contract’s details (requires the AI module). Transfers outside the EU/EEA now have a transfer basis per country, contracts can be ended and reopened, and a new Data flow tab shows where a third party takes your data.

✓Bug fixes#

  • #9451Fixed a bug where tasks in OE testing couldn’t be finalized without samples. On type two engagements, a task with no samples can now be finalized without adding a dummy sample.
  • #9455Fixed a bug where the daily and weekly summary emails and the “Task due soon” email included tasks from projects with notifications turned off.

Release 60.2#

Each audit task now has its own history, the activity log has a new design everywhere, and auditors can start OE testing before D&I testing is done.

✦New features#

  • #9431Audit tasks now have their own history. Click the clock icon at the top of the task panel to see every change to the task, newest first: field changes, the testing phase, test results, evidence, annotations and working papers. The history stays open when you move to the next or previous task.

↑Improvements#

  • #9438New design for the activity log, the same everywhere: the Activity log in the menu, user profiles, History tabs and the recent activity on Home and overview pages. Each change shows who made it, which item it was made to and what it changed from and to. Several quick changes to the same item are grouped, and History tabs can be filtered by kind of change and by person.
  • #9429Auditors can now take samples on the OE testing tab while a task is still in D&I testing. A notice on the tab lets you move the task to OE testing when you’re ready. Moving a task back to D&I testing is now done from the documentation collection card, and reopening the documentation collection is recorded in the history.

✓Bug fixes#

  • #9432Fixed a bug where the ✕ on the partition chip in the sidebar took you back to the client. The ✕ now hides the chip, and clicking the chip itself still takes you back to the client.

Release 60.1#

!Hot fixes#

  • #9427Fixed a bug where samples taken before Release 60 were only shown on the documentation collection task, not on the OE tab of the main task. On type two projects, tasks that were finalized or already had samples are now in OE testing.

Release 60#

A new look for the whole platform, an engagement overview for audit projects, evidence annotation and AI import of audit plans.

✦New features#

  • #9335New engagement overview for audit projects, built around the four audit phases. Projects now have Manager and Associate roles, an hours budget with time logging, and a Documents tab that keeps every file on the engagement in one place. The task list and task panel also have a new layout.
  • #9350You can now annotate evidence files (images, PDFs and Office files): highlight text, draw boxes and arrows, and pin comments. The original file is never changed, and annotations are only shown to the audit team.
  • #9390You can now use bold, italic and underline in task notes, testing notes, control descriptions, performed tests, conclusions and client comments. The formatting is kept in Word reports.
  • #9394New Statement & description tab on audit projects, with the management statement and the system description side by side. Both support headings, lists and text formatting, and you can import them from a Word document.
  • #9404You can now import an audit plan from a PDF or Word file into an audit template. The AI reads the document and suggests how it maps to the template, and you review the result before saving. Requires the AI module.

↑Improvements#

  • #9365, #9391New layout for the Users page, user profiles and client and partition pages. Admins can now see when each user last signed in and whether their invite arrived, resend invites and change a user’s sign-in method. A new AI usage page under Billing shows token use for the client and its partitions.
  • #9367, #9381New Maintenance overview where admins can search all settings, see what isn’t set up yet and follow recent changes. Changes to maintenance settings, such as data categories, departments and retention rules, are now recorded in the history.
  • #9372, #9373New navigation and Home page. One sidebar replaces the top bar and side menu, with a workspace switcher for clients and partitions. Home now shows all your tasks across projects in one prioritized list, and what’s new on each task since you last opened it.
  • #9383New login page. You can choose your language before signing in, and Microsoft and Google users go straight to their usual sign-in. After 5 wrong passwords, sign-in pauses for 15 minutes.
  • #9385, #9391Redesigned notification emails that are clearer and display properly in Outlook. Each client and partition can now choose instant emails, a daily or weekly summary, or no emails, and there’s a new reminder when a task is due soon.
  • #9396Starting a project is now one simple dialog: pick what you want to achieve instead of a project type, or run a recurring project again. A new Project management page with a year plan replaces the old project lists, recurring projects have their own page, and the scope tabs are easier to use.
  • #9398New layout for assessment templates and a new dialog for creating and editing tasks. You can now set default drop-downs on a template, with a color and icon for each option, and task descriptions support text formatting.
  • #9423Upgraded the web server to a newer version of nginx with HTTP/2 for faster page loads, improved security and long-term maintainability.

✓Bug fixes#

  • #9361Fixed a bug where the controls on some completed or closed projects couldn’t be read. Completed and closed projects are now read-only: you can read everything, but nothing can be changed until the project is reopened.

Release 59.1#

✦New features#

  • #9338Audit templates can now require an independence declaration. Audit team users are asked to declare their independence the first time they open the audit project, and can’t open it until they’ve accepted.
  • #9340You can now add a default text for testing notes to questions on assessment templates. The text is filled in automatically in new projects.

↑Improvements#

  • #9339Each control now clearly shows everyone who has signed off and how many sign-offs it has. You can set how many sign-offs a project requires, and the QA log has a new design.
  • #9357Upgraded the AI to GPT-6.1.

✓Bug fixes#

  • #9345Fixed a bug where all fields on a control assessment task could be cleared after saving. These tasks are now completed in one step with the new Finalize task button.
  • #9352Fixed a bug where uploading some files to tasks failed. You can now upload files of up to 30 MB, and you get a clear message if a file is too large.
  • #9355Fixed a bug where the AI buttons on tasks returned an error if an attachment couldn’t be read. Images and PDFs that text recognition can’t read are now sent directly to the AI.

Release 59#

✦New features#

  • #9341Added the report tag ${project.test_notes}.

↑Improvements#

  • #9334Upgraded the database to a newer version of MySQL for better performance, security and long-term maintainability.

Release 58.4#

✦New features#

  • #9325Added the report tag ${project.tasks_paper_2}.

↑Improvements#

  • #9329The chat in global assessment tasks now refreshes automatically.

✓Bug fixes#

  • #9294Fixed a bug where links in email notifications sometimes started with http instead of https.

Release 58.3#

✦New features#

  • #9318Added the report tags ${alternativeMeasures.all} and ${alternativeMeasures.all.table}.
  • #9320New report tags ${project.start_date_us} and ${project.end_date_us} for the US date format MM/DD/YYYY.

↑Improvements#

  • #9319New layout for the chat section in global assessment tasks.
  • #9321Removed the type 1 and type 2 indicators from global assessment task headers.
  • #9322Added indicators in the task assignment window that make it clearer whether tasks are assigned to the main task or to documentation collection tasks.

✓Bug fixes#

  • #9315Fixed a bug where the QA status filters for global assessment tasks didn’t work properly.

Release 58.2#

↑Improvements#

  • #9295The report tag ${project.tasks_paper} now sorts by sort order instead of alphabetically by reference number.
  • #9305Upgraded the AI to GPT-5.2.
  • #9307Updated the task creation window on global assessment projects.

✓Bug fixes#

  • #9291Fixed a bug where one-time projects were created with the status Pending instead of In progress.
  • #9297Fixed a bug where the project progress percentage was sometimes miscalculated.
  • #9300Fixed a bug where global assessment tasks were listed in random order under “List all tasks”.

Release 58.1#

↑Improvements#

  • #9257Core platform improvements for stability, performance and long-term maintainability.

✓Bug fixes#

  • #9288Fixed a bug where newly added custom fields appeared on old tasks because the custom field wasn’t explicitly set to “No”.

Release 58#

↑Improvements#

  • #9237The Create/Edit task form now matches the one used for assessment questions.
  • #9289Updated Home page layout and user experience, including a mobile-friendly design.

Release 57.7#

↑Improvements#

  • #9238Attached images are now automatically reduced to a maximum of 2048 px to meet AI requirements.
  • #9279When the documentation response drop-down is set to Auditor, it’s now mandatory to fill it in on the main task.

✓Bug fixes#

  • #9240Fixed a bug where “Add selected” for suggested attachments on documentation collection tasks didn’t work.
  • #9258Fixed a bug where cloned assessment child projects didn’t immediately get the correct status.
  • #9261Fixed an issue where files dragged onto a documentation collection task weren’t always registered as added from the documentation collection view.
  • #9263Fixed an issue where member users sometimes couldn’t open the Update measures task.
  • #9265The documentation collection task table now updates after a task has been completed.
  • #9272Fixed a bug where the “List all tasks” table view didn’t display correctly.

2025

Release 57.6#

✦New features#

  • New report tag for the long date format.
  • Report language support for Spanish, Dutch and Swedish.

↑Improvements#

  • #9117Notification emails are no longer sent to the user who made the change.
  • Optimized AI queries for better performance.
  • New layout and animations for the AI agent.
  • Upgraded the AI agent to Microsoft OpenAI GPT-5.

Release 57.5#

✦New features#

  • #9241You can now add a website to clients and partitions, and output it in reports.
  • #9242You can now define a documentation collection drop-down.
  • #9244You can now display and filter all project tasks.