Book a demo
User Guides

Auditor user guide

Updated October 31, 2026 21 min read

User guide · Auditors

User guide for the auditor

How to run an audit in Complyon from start to finish: start the engagement, collect evidence from the customer, test the controls, sign off and generate the report.

For auditors, managers and partnersUpdated for Release 60About 25 minutes

OverviewBefore you start#

Complyon is a compliance platform for collecting documentation for audits and other types of assessments. As an auditor, you plan the audit, ask the customer for evidence, test it, sign it off and produce the report, all in one place.

This guide follows the order you’ll normally work in. Use the contents menu to jump to a topic, and click any screenshot to enlarge it.

New look in Release 60

Complyon has a new sidebar, a new Home page and a new engagement page built around the four audit phases. If you used Complyon before, start with Find your way around and The engagement. All changes are listed in the release notes.

TermWhat it means
ClientThe auditor’s own workspace, for example your audit firm. Templates and users managed here can be shared across all customers.
PartitionA customer’s workspace under the client. Each audited customer has its own partition.
EngagementAn audit project for one audit period, for example ISAE 3402 Type 2 for 2026. This is where the audit work happens.
Recurring projectHolds the setup you reuse every period, for example a yearly ISAE 3402 audit. Each round it starts is its own engagement.
Manager and AssociateThe two roles on an engagement team. See Team and roles.
Main taskThe auditor’s part of a control: D&I assessment, OE testing, conclusion and sign-off.
Documentation collection taskThe customer’s part of a control: answering what you ask for and uploading evidence.

Step 1Log in#

Go to system.complyon.com, or open the invitation email from Complyon. You can log in with your organization’s own login (single sign-on through Microsoft or Google), or with a Complyon password. Single sign-on is the most secure option and the one we recommend. You can change the language in the upper right corner before you sign in.

Single sign-on (recommended)#

  1. Enter your work email and click Continue. Or click Microsoft or Google directly.
  2. If your organization signs in with Microsoft or Google, click Continue with Microsoft or Continue with Google. Complyon remembers how you signed in last time.
  3. Log in with your normal work credentials.
Login failed?

If the login fails, your IT department probably needs to approve the Complyon app in your organization’s Microsoft or Google directory. Alternatively, ask your Complyon administrator to set up password login for you.

Enter your work email, or pick Microsoft or Google

Complyon password#

  1. Enter your work email and click Continue.
  2. If this is the first time you log in with a password, click Forgot your password? and follow the instructions in the email you receive.
  3. Enter your password and click Sign in.
Locked out?

After 5 wrong passwords, sign-in pauses for 15 minutes. Wait for the timer, or reset your password. If you can’t reset it, your user may not exist in Complyon yet, or it may only be allowed to log in with single sign-on.

First time? Start with “Forgot your password?”

Step 2Find your way around#

Everything in Complyon is reached from the sidebar on the left, and every working day starts on the Home page.

The first time you log in, check that you’re in the correct workspace at the top of the sidebar. When you work in a customer’s partition, the sidebar shows a violet edge and a Partition chip, so you always know where you are.

  1. 1. Workspace switcher: switch between your client and its partitions. Search, or pick one of your recent workspaces. The card button next to it opens the profile of the current client or partition.
  2. 2. Main menu: menu items appear as things are assigned to you. You’ll find audit projects under Project management.
  3. 3. Settings, Activity log, Notifications and Language: Settings is for administrators. Activity log and Notifications open as panels next to the sidebar. Change the language here in two clicks.
  4. 4. Account card: your profile, where you can add a profile picture so colleagues and customers recognize you, and sign out.
  5. 5. Search and quick actions: search your tasks and projects (also with Ctrl+K or ⌘K), start a new project or invite a user.
  6. 6. Your week: how many of this week’s tasks are done, plus your overdue tasks, tasks due today and tasks ready to test.
More room

Collapse the sidebar to a slim icon rail with the arrow button at its edge, or press [. Complyon remembers your choice in this browser.

Home#

Home shows your own work across all projects in the workspace, with the most urgent first.

  1. 1. Focus now: the tasks that unblock the most work, picked from deadlines, delivered documentation and sign-offs.
  2. 2. My work: all your tasks in one list, grouped by project and control objective. Use the tabs to see what’s to do, ready to test, waiting for your sign-off or rejected. Signals show new chat messages and new attachments.
  3. 3. Next 7 days: deadlines coming up this week.
  4. 4. Waiting on clients: documentation the customer still owes you. Click Remind to send a reminder.

Click a task to see what’s new since you last opened it: delivered documentation, new attachments, chat messages and tests. Click Open task to work on it. Further down, My projects shows the phase and health of each of your projects.

Step 3Start a project#

Every audit lives in a project. An audit you do once is a single engagement. An audit you repeat, for example every year, is a recurring project that starts a new engagement (a round) for each period.

Start an audit#

  1. Click New project on the Home page, or Start project on the Project management page.
  2. Under What do you want to get done?, choose Run an audit. You can also search for a template, for example “SOC 2”.
  3. Fill in the form, check What happens next, and click Create project.
  1. 1. Audit program: the assessment template the audit starts from.
  2. 2. Name: suggested from the template, but you can change it.
  3. 3. How often? Choose Once for a single audit period, or Repeats for an audit you do every period, with how often and the first run.
  4. 4. Create the project automatically on each run date: off, the round shows as due under Run again and you start it with one click. On, a new round is created and tasks go out by themselves.
  5. 5. What happens next: a summary of what is created and when.

Nothing is sent to anyone when you create the project. You’re the Manager of the new engagement, and you add the rest of the team on the project page.

Run again

Your recurring projects are listed at the top of the dialog under Run again, with their status. Click one to start its next round.

Project management#

The Project management page shows all projects in the workspace. It has three views:

  1. 1. Overview, Year plan and All projects: the overview shows what’s running now, what needs attention and what’s coming up. The year plan shows all rounds over the next 12 months. All projects is a filterable list of every project.
  2. 2. Start project: opens the Start a project dialog.
  3. 3. Running now: projects in progress, sorted by due date, with their progress.
  4. 4. Needs attention: overdue projects and rounds that are due but haven’t been started. Click Remind to nudge the assignees.

Recurring projects#

Open a recurring project to see its rounds and schedule, and the base information that’s copied into every new round, such as the description, task assignees and attachments.

  • Rounds: every round is its own engagement. Click a round to open it, or Copy round to start a new round from an earlier one.
  • Schedule: when new rounds start, and when documentation and the round are due. Rounds can be Created automatically, or you start each round yourself.
  • Run a round now: starts a new round right away. The schedule isn’t changed.

Changes to the base information apply from the next round.

Step 4The engagement#

The engagement page is built around the four audit phases: Engagement acceptance, Preparation and planning, Execution and Reporting and completion. Each phase has a checklist of steps, and you can see at a glance how far the audit has come.

  1. 1. Project header: status, your role, and when documentation and the project are due. The buttons edit the project, open its settings and history, or delete it.
  2. 2. Progress: how many tasks are finalized and signed off, and how many are rejected, awaiting sign-off or unassigned.
  3. 3. Phases: the four audit phases and how many steps are completed in each.
  4. 4. Tabs: Overview, Engagement acceptance, Planning, Statement & description, Tasks, Documents and Reporting. A warning icon shows a tab that still needs input.
  5. 5. Needs attention: what’s blocking the audit, for example tasks without an assignee, tasks rejected in QA or a phase that’s over budget.
  6. 6. Current phase: the steps of the phase you’re in. Set each step’s status and upload its documents, for example the engagement letter or the audit strategy.
  7. 7. Schedule: the start date and the due dates for documentation collection and the project.

Further down the Overview, you’ll find the tasks per control objective, the budget and time, the engagement team and the recent activity.

Choose the steps

Not every engagement needs every checklist step. Click the settings button in the project header to choose which steps are included. Here you also set the number of Required sign-offs for each task.

Team and roles#

Each member of the engagement team has one of two roles. A role only applies to this engagement. Add team members under Engagement team on the Overview tab with Add team member.

AreaManagerAssociate
Engagement acceptance, planning and budgetEditView
Project settings, team and task assigneesEditView
Statement & description, tasks and reportingEditEdit
Sign off tasks and accept the engagementYesNo
Log their own timeYesYes

Only team members can be assigned to main tasks. Don’t add customer users to the team: they’re assigned to documentation collection tasks instead. Client and partition administrators can always manage the team, so they can add a new Manager if needed.

Engagement acceptance#

Before the audit work starts, a Manager completes the acceptance steps on the Engagement acceptance tab:

  • Client evaluation, including the independence declarations if the template requires them.
  • Pre-engagement checks and the Engagement letter. Set each step’s status and upload its documents.
  • Scope period: a period audit (Type 2) includes both D&I testing and OE testing. A point-in-time audit (Type 1) only includes D&I testing.

When all steps are completed, click Accept engagement. Until then, Planning, Tasks and Reporting are locked. The engagement team, with each member’s role and independence declaration, is shown next to the steps.

Independence declarations

If the assessment template requires an independence declaration, every audit team member is asked to declare their independence the first time they open the engagement, and can’t open it until they’ve accepted.

Planning, budget and time#

The Planning tab holds the planning steps (business understanding, risk and materiality assessment, and audit strategy) with their documents, the schedule and the contact persons.

  • Budget and time: a Manager sets an hours budget per phase with Edit budget. Every team member can log their own time with Log time. You’ll see the budget against the time spent per phase and per team member, and Needs attention warns you when a phase goes over budget.

Step 5Statement & description#

The Statement & description tab holds the two texts that set the scene for the report: the management statement and the system description, side by side.

  1. 1. Management statement and System description: click the pen to write or edit a text. Use bold, italic, underline, Header 2 and Header 3, and bulleted, numbered or lettered lists. The headers become headings in the Word report.
  2. 2. Import Word document: start from an existing document. Headers, lists and bold, italic and underline are kept, and everything else becomes plain text. Check the text and save it.
  3. 3. Send as task: ask the customer to write or update the text. They get a task on their Home page and deliver the text when they’re done. You can send it back with a comment if something should be changed.
In the report

Both texts go into the Word report through report tags. See report tags.

Step 6Tasks#

The Tasks tab is where the audit work happens. It holds the audit plan (the task list), the individual tasks with their tests, and the quality control and sign-off.

Task list#

The task list is your audit plan. It’s generated from the assessment template and grouped by control objective, and you can adjust it to fit this specific audit.

  1. 1. Search and filters: show only the tasks assigned to you, or filter by phase, documentation, response and status.
  2. 2. Task tools: assign main tasks and documentation collection tasks in bulk, send reminders, change the order of the control objectives, expand or collapse all, and add tasks from the template or a task unique to this project.
  3. 3. Control objective: the tasks are grouped under their control objective, with a progress bar. Use the pen and trash icons on the row to edit or delete the control objective.
  4. 4. Tasks: one row per task, with its stage, response, assignees, sign-offs and when it was last updated. Click a row to open the task.
Before you remove a task

Removing a task deletes all project-specific changes to it. You can add it again from the assessment template, but it will start from the template text again.

Work on a task#

A task opens in the task panel. The stages at the top take you through the task in order. The control and the customer’s documentation are on the left, and the client chat and internal notes on the right. Use the arrows in the upper right corner to go to the previous or next task without closing the panel.

  1. 1. Stages: D&I assessment, OE testing (for period audits), Conclusion and QA sign-off. Each stage shows its status.
  2. 2. Control: what the control is and how to test it, usually pre-filled from the assessment template.
  3. 3. Documentation collection: the customer’s status, deadline and comment, with a link to their task. Re-open gives the task back to the customer.
  4. 4. Attachments: the evidence for this task. Annotate, view, download or remove a file, or click Add attachment.
  5. 5. Your assessment: the control description, the performed test and the testing notes. Every field saves on its own.
  6. 6. Client chat and internal notes: talk with the customer about this task in the chat. Internal notes are only seen by the audit team.
  • Text formatting: use bold, italic and underline in notes, testing notes, control descriptions, performed tests and conclusions. The formatting is kept in the Word report.
  • Add attachment: reuse a file that’s already in the engagement (suggested attachments and the evidence library) before you upload a new one. Upload a working paper to keep a file on this task only. Working papers are never shown to the customer.
AI assistant

Click Write with AI next to a field to get a suggestion based on the control, the customer’s documentation and the attachments. Using a suggestion opens the field for editing, so you still check and save it yourself.

Annotate evidence#

Open an image, PDF or Office file from a task and click Annotate to mark up the evidence: highlight text, draw boxes and arrows, and pin comments.

  • The original file is never changed. Annotations are kept separately, and you can always open or download the original.
  • Annotations are only shown to the audit team, never to the customer.
  • Office files are converted to a PDF copy the first time you annotate them.
  • When you download the attachments as a ZIP file, annotated files are included as an extra annotated PDF.

OE testing and samples#

For a period audit (Type 2), you test how the control operated over the period by taking samples.

  1. When the D&I assessment is done, click Start OE testing. This locks the customer’s task comment and attachments. From now on, the customer answers in each test.
  2. Click New test for each sample. Give it a name that identifies the sample (for example the change request number), describe what the customer must provide, and choose whether the customer’s answer and files are mandatory. Click Create test.
  3. Use Duplicate test to create the next sample with the same settings.
  4. When the customer has answered, mark each test Passed or Deviation. If something is missing, click Send back to the client and write in the comment what’s missing. The customer is notified.
  1. 1. New test: add a sample.
  2. 2. Tests: one row per sample, with the customer’s progress and the result. Click a test to open it.
  3. 3. Move back to D&I: the tests are kept and come back when OE testing starts again.
With the clientClient donePassedDeviation

Conclusion#

Response
The conclusion of the task, shown in the task list. The options and their colors come from the assessment template.
Conclusion
The text for the report, usually pre-filled from the assessment template.
Observations
Optional. Used to highlight high-level findings in the report. Ask your manager before using this field.

When D&I, the tests and the conclusion are done, click Finalize task. This sends the task to QA.

AI assistant

Click Run full analysis to have the AI assistant analyze the control, the D&I assessment, the tests, the testing notes and the attachments, and suggest a conclusion. Click Use as conclusion text to use it.

Guide the AI

You can steer the AI assistant by writing a note to it in the testing notes or internal notes, for example: “Note to AI: Disregard failed samples.”

QA and sign-off#

A finalized task waits for sign-off on the QA sign-off stage. A task counts as signed off when it has the number of sign-offs set for the project, and each sign-off is a level.

  1. 1. Conclusion to review: the response and conclusion the reviewer signs off on.
  2. 2. Sign-offs: click Sign off, or Reject and re-open with a comment. A rejected task opens again, and the auditor finalizes it again when it’s fixed.
  3. 3. Quality control log: every QA event on the task.

Only Managers can sign off. Find the tasks waiting for you under Sign-offs in My work on the Home page.

Step 7Reporting and documents#

Reporting#

On the Reporting tab you write the overall conclusion, review the observations and generate the report.

  1. 1. Conclusion: the overall conclusion for the report. Observations lists all observations across all tasks.
  2. 2. Generate new report: click the Word icon to create the Microsoft Word report from your report template. The report is added under Attachments, and you get an email and a notification when it’s ready.
  3. 3. Export center: Attachments (ZIP) packs all attachments in the project into one ZIP file, including annotated copies. Task list (Excel) exports all tasks with their fields and status. You get a notification when an export is ready.
Report templates

The Word report is built from your report template and its report tags. See the full list of report tags.

Documents#

The Documents tab keeps every file that belongs to the engagement in one place, grouped by phase and step, plus the system description files, reports, exports and other project documents.

  • Upload to a phase and step, or download, rename and delete files.
  • Sign off or Reject a document, for example the engagement letter.
  • Link to tasks: link an evidence file to the tasks it documents. Use the filters to find evidence that isn’t linked to a task yet, or documents that aren’t signed off.

Step 8Settings#

Administrators find Settings in the sidebar. The settings overview shows every setting for the workspace on one screen.

  1. 1. Search and quick actions: find any setting (also with Ctrl+K or ⌘K), or invite a user directly.
  2. 2. Settings by area: one row per setting with its count. Not set up shows what’s missing, and + adds an item.
  3. 3. Needs attention: settings that aren’t set up yet. Further down, Recent changes shows the latest changes from the history log.

Users#

Users can be added to the auditor’s workspace (client) or to a customer’s workspace (partition). A user can have access to several clients and partitions, and stays in Complyon until they’re removed from the last one. Once a user exists, only that user can change their own name and profile picture.

  • Last login: when each user last signed in. For users who haven’t signed in yet, you see whether the invite email arrived, and you can Resend invite.
  • Status filters: find users who are signed in, invited, have invite problems or are locked.
  • Click a user to edit their role, lock them out without deleting them, or change their sign-in method.
  • Invite user creates a new user. You can also invite users from many other screens, wherever you see a + next to a user drop-down.
  • Merge users combines two users into one. All tasks and ownerships move to the remaining user.

Sign-in methods

Microsoft or Google
The user must log in with single sign-on from that provider. Sometimes the administrator of the user’s directory must approve Complyon first.
Password
The user logs in with a Complyon password. Note that password login keeps working even if the user is locked or removed in their own directory.
A different Microsoft sign-in address (UPN)
Use this when the user’s Microsoft login name differs from their email address, for example after two Microsoft directories have been merged.

Email notifications#

Open the profile of the client or partition (the card button next to the workspace switcher) and choose how everyone in the workspace gets notification emails:

SettingWhat it means
InstantOne email as soon as something happens.
Daily summaryOne email each weekday at 07:00.
Weekly summaryOne email every Monday at 07:00.
OffNo emails. Notifications only in the app.

You can also choose which emails to include: task assigned, task due soon (3 days before the deadline), task overdue, and audit plan read. Invitations and password emails are always sent.

Assessment templates#

Assessment templates fill a new audit project with control objectives and tasks and set its baseline, such as the required sign-offs and which Word report template to use. Manage templates on the client workspace so they’re shared across all customers. For very customer-specific work papers, you can create a template on the customer’s partition instead.

  1. 1. Template header: the template’s type and key numbers. Create tasks and control objectives, Import audit plan, or edit the template, open its settings and history, or delete it.
  2. 2. Tabs: the assessment tasks and the default drop-downs.
  3. 3. Tasks by control objective: drag tasks to reorder them, use the arrows to move a control objective, and Add task to CO to add a task. Change several tasks edits many tasks at once.
  4. 4. Template setup: a checklist of the template’s settings: default drop-downs, required sign-offs, independence declaration, engagement acceptance, checklist steps, system description, relations and the report template.
  • Create and edit tasks: one dialog with four steps you can open in any order: Task, Auditor’s work, Documentation collection and Controls. Each step shows what’s missing, and you can save from any step.
  • Default drop-downs: set one default list of responses and one for documentation collection, with a color and an icon for each option. Tasks set to Use template default follow these lists, and saving a change updates every linked task in the template.
  • Report template: upload the Microsoft Word file with your own layout and report tags that reports are built from.

Import an audit plan#

Already have the audit plan as a PDF or Word file? Import it into a control assessment template instead of typing it in.

  1. Open the template and click Import audit plan.
  2. Upload the PDF, DOC or DOCX file (up to 30 MB). The AI reads it in the background, so you can close the dialog and come back. You get an email and a notification when it’s ready.
  3. Map the columns: for each template field, choose the column in the document it comes from. The AI suggests a mapping.
  4. Check the preview, turn off anything you don’t want, and save the control objectives and tasks to the template.
AI module

Import audit plan is available when your workspace has the AI module.